Between Castle Douglas and Kirkcudbright, Dumfries and Galloway
Chapmans Howe Wind Farm is a 6.9 MW onshore wind project in Scotland. The applicant or operator on record is REG Windpower. The planning application was refused. The determining authority is Dumfries and Galloway, reference 13/P/2/0189.β¦
Refused
Project stageRefused
PlanningJun 2013 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2015-01-26.
Registered planning capacity; not measured generation.
Chapmans Howe Wind Farm is a 6.9 MW onshore wind project in Scotland. The applicant or operator on record is REG Windpower. The planning application was refused. The determining authority is Dumfries and Galloway, reference 13/P/2/0189.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
6.900 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
REG Windpower
Owner / operator
REG Windpower
Location
Between Castle Douglas and Kirkcudbright, Dumfries and Galloway