πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Chancerygate Way

7 Chancerygate Way, Farnborough, Hampshire, Hampshire, GU14 8FF

Chancerygate Way is a 0.3 MW solar farm project in South East. The applicant or operator on record is Oakapple Renewable Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Rushmoor, reference 20/00006/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJan 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2021-02-07.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.300 MW
Registered Capacity

πŸ“‹ Project Overview

Chancerygate Way is a 0.3 MW solar farm project in South East. The applicant or operator on record is Oakapple Renewable Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Rushmoor, reference 20/00006/FUL.

Site Schematic

SUBSTATION ? ha Β· 0.3 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperOakapple Renewable Energy
Owner / operatorOakapple Renewable Energy
Location7 Chancerygate Way, Farnborough, Hampshire, Hampshire, GU14 8FF
RegionSouth East
Coordinates51.3116451Β°N, 0.753798Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2020-01-06