Chainbridge Road is a 8 MW solar farm project in East Midlands. The applicant or operator on record is Temporis Capital. The application has been withdrawn or the scheme abandoned. The determining authority is Bassetlaw, reference 14/00087/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJan 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2014-09-16.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

8.000 MW
Registered Capacity

πŸ“‹ Project Overview

Chainbridge Road is a 8 MW solar farm project in East Midlands. The applicant or operator on record is Temporis Capital. The application has been withdrawn or the scheme abandoned. The determining authority is Bassetlaw, reference 14/00087/FUL.

Site Schematic

SUBSTATION ? ha Β· 8 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)8.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperTemporis Capital
Owner / operatorTemporis Capital
LocationLand 1 Chainbridge Road Lound Nottinghamshire, Nottinghamshire
RegionEast Midlands
Coordinates53.367101Β°N, 0.9207851Β°W

Additional published register fields

Registered technologySolar Photovoltaics

πŸ“… Project Timeline

2014-01-29