east of Cwm Llinau on Mynydd Y Cemmaes ,AES, Llanbrynmair, Powys, Powys, SY19
Cemmaes 3 Wind Farm is a 24 MW onshore wind project in Wales. The applicant or operator on record is Acciona Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Powys, reference P/2008/0249.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningFeb 2008 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Withdrawn.
Official register: July 2026
Recorded status: Appeal Withdrawn. Source record updated 2015-11-03.
Registered planning capacity; not measured generation.
Cemmaes 3 Wind Farm is a 24 MW onshore wind project in Wales. The applicant or operator on record is Acciona Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Powys, reference P/2008/0249.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
24.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Acciona Energy
Owner / operator
Acciona Energy
Location
east of Cwm Llinau on Mynydd Y Cemmaes ,AES, Llanbrynmair, Powys, Powys, SY19