πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Caves Farm Solar Park

Land OS 3100 At Caves Farm Pitney Langport Somerset, Somerset

Caves Farm Solar Park is a 4.8 MW solar farm project in South West. The applicant or operator on record is AEE Renewables. The planning application was refused. The determining authority is Somerset, reference 13/00441/FUL.…

Refused
Project stageRefused
  1. PlanningFeb 2013 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2013-06-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

4.800 MW
Registered Capacity

πŸ“‹ Project Overview

Caves Farm Solar Park is a 4.8 MW solar farm project in South West. The applicant or operator on record is AEE Renewables. The planning application was refused. The determining authority is Somerset, reference 13/00441/FUL.

Site Schematic

SUBSTATION ? ha Β· 4.8 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)4.800 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAEE Renewables
Owner / operatorAEE Renewables
LocationLand OS 3100 At Caves Farm Pitney Langport Somerset, Somerset
RegionSouth West
Coordinates51.055581Β°N, 2.7833149Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)115000

πŸ“… Project Timeline

2013-02-07