Cavendish Dock & Adj To The Port Of Barrow, Cavendish Dock Road, Barrow in Furness, Cumbria, LA14 2TW
Cavendish Dock Road - Solar Array is a 40 MW solar farm project in North West. The applicant or operator on record is Associated British Ports. The scheme is currently in the planning system, submitted March 2025. The determining authority is Westmorland and Furness, reference B0β¦
In Planning
Project stageIn planning
PlanningMar 2025 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2026-03-02.
Registered planning capacity; not measured generation.
Cavendish Dock Road - Solar Array is a 40 MW solar farm project in North West. The applicant or operator on record is Associated British Ports. The scheme is currently in the planning system, submitted March 2025. The determining authority is Westmorland and Furness, reference B03/2025/0085.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
40.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Associated British Ports
Owner / operator
Associated British Ports
Location
Cavendish Dock & Adj To The Port Of Barrow, Cavendish Dock Road, Barrow in Furness, Cumbria, LA14 2TW