Land adjacent to the M62, Causeway Bridges Farm, Alder Lane, Burtonwood, Warrington, WA5 4BN, Cheshire
Causeway Bridges Wind Farm is a 4 MW onshore wind project in North West. The applicant or operator on record is Wind Direct. The application has been withdrawn or the scheme abandoned. The determining authority is Warrington, reference 2008/12807.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningApr 2008 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedMay 2008 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2014-07-03.
Registered planning capacity; not measured generation.
Causeway Bridges Wind Farm is a 4 MW onshore wind project in North West. The applicant or operator on record is Wind Direct. The application has been withdrawn or the scheme abandoned. The determining authority is Warrington, reference 2008/12807.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
4.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Wind Direct
Owner / operator
Wind Direct
Year consented
2008
Location
Land adjacent to the M62, Causeway Bridges Farm, Alder Lane, Burtonwood, Warrington, WA5 4BN, Cheshire