Onshore Wind

Causeway Bridges Wind Farm

Land adjacent to the M62, Causeway Bridges Farm, Alder Lane, Burtonwood, Warrington, WA5 4BN, Cheshire

Causeway Bridges Wind Farm is a 4 MW onshore wind project in North West. The applicant or operator on record is Wind Direct. The application has been withdrawn or the scheme abandoned. The determining authority is Warrington, reference 2008/12807.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningApr 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedMay 2008 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2014-07-03.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

4.000 MW
Registered Capacity

πŸ“‹ Project Overview

Causeway Bridges Wind Farm is a 4 MW onshore wind project in North West. The applicant or operator on record is Wind Direct. The application has been withdrawn or the scheme abandoned. The determining authority is Warrington, reference 2008/12807.

Site Schematic

NORTH WEST Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)4.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWind Direct
Owner / operatorWind Direct
Year consented2008
LocationLand adjacent to the M62, Causeway Bridges Farm, Alder Lane, Burtonwood, Warrington, WA5 4BN, Cheshire
RegionNorth West
Coordinates53.4240247Β°N, 2.6224496Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2
No. of Turbines2

πŸ“… Project Timeline

2008-04-28
2008-05-29