Unit K, Castle Road, Eurolink, Sittingbourne, Kent, ME10 3RN
Castle Road, Eurolink - Solar Panels is a 0.46 MW solar farm project in South East. The applicant or operator on record is Cross & Wells Limited. Planning permission has been granted as of September 2023 and it is awaiting construction. The determining authority is Swale, referenβ¦
Consented / Approved
Project stageConsented
PlanningAug 2023 (completed)
ConsentedSep 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-09-29.
Registered planning capacity; not measured generation.
Castle Road, Eurolink - Solar Panels is a 0.46 MW solar farm project in South East. The applicant or operator on record is Cross & Wells Limited. Planning permission has been granted as of September 2023 and it is awaiting construction. The determining authority is Swale, reference 23/503167/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.460 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Cross & Wells Limited
Owner / operator
Cross & Wells Limited
Year consented
2023
Location
Unit K, Castle Road, Eurolink, Sittingbourne, Kent, ME10 3RN