πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Castle Eaton Anaerobic Digestion Plant

Castle Eaton Anaerobic Digester Plant Droveway Castle Eaton Swindon, Wiltshire, SN6 6JX

Castle Eaton Anaerobic Digestion Plant is a bioenergy / waste project in South West. The applicant or operator on record is Biomethane (Castle Eaton) Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Swindon, reference S/20/1685.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJan 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2026-07-10.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

πŸ“‹ Project Overview

Castle Eaton Anaerobic Digestion Plant is a bioenergy / waste project in South West. The applicant or operator on record is Biomethane (Castle Eaton) Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Swindon, reference S/20/1685.

πŸ”§ Technical Specifications

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBiomethane (Castle Eaton) Limited
Owner / operatorBiomethane (Castle Eaton) Limited
LocationCastle Eaton Anaerobic Digester Plant Droveway Castle Eaton Swindon, Wiltshire, SN6 6JX
RegionSouth West
Coordinates51.6545317Β°N, 1.7916831Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2021-01-20