Solar Farm

Cameron Reservoir

Cameron Reservoir, Cameron Drive, Kirkcaldy, Fife, KY16 8PF

Cameron Reservoir is a 5 MW solar farm project in Scotland. The applicant or operator on record is Green Power Consultants. The application has been withdrawn or the scheme abandoned. The determining authority is Fife, reference 15/00538/FULL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningApr 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedOct 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2018-09-27.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Cameron Reservoir is a 5 MW solar farm project in Scotland. The applicant or operator on record is Green Power Consultants. The application has been withdrawn or the scheme abandoned. The determining authority is Fife, reference 15/00538/FULL.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGreen Power Consultants
Owner / operatorGreen Power Consultants
Year consented2015
LocationCameron Reservoir, Cameron Drive, Kirkcaldy, Fife, KY16 8PF
RegionScotland
Coordinates56.2830352Β°N, 2.8465145Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)100350

πŸ“… Project Timeline

2015-04-20
2015-10-13