Onshore Wind

Cambridge Wind Farm

L and South West of Huntingdon, Bosworth and Conningham, Cambridgeshire

Cambridge Wind Farm is a 32 MW onshore wind project in Eastern. The applicant or operator on record is Your Energy. The planning application was refused. The determining authority is South Cambridgeshire, reference S/1663/04/F.…

Refused
Project stageRefused
  1. PlanningAug 2004 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2011-11-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

32.000 MW
Registered Capacity

πŸ“‹ Project Overview

Cambridge Wind Farm is a 32 MW onshore wind project in Eastern. The applicant or operator on record is Your Energy. The planning application was refused. The determining authority is South Cambridgeshire, reference S/1663/04/F.

Site Schematic

EASTERN Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)32.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperYour Energy
Owner / operatorYour Energy
LocationL and South West of Huntingdon, Bosworth and Conningham, Cambridgeshire
RegionEastern
Coordinates52.2762143Β°N, 0.032637Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2
No. of Turbines16

πŸ“… Project Timeline

2004-08-10