Solar Farm

Cambridge Solar Farm

Land east of Battle Gate Road, St. Neots Road, Dry Drayton, Cambridge, Cambridgeshire, CB23 8BA

Cambridge Solar Farm is a 49.9 MW solar farm project in Eastern. The applicant or operator on record is Big 60 Million. The planning application was refused. The determining authority is South Cambridgeshire, reference S/1714/15/FL.…

Refused
Project stageRefused
  1. PlanningJul 2015 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2019-06-10.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.900 MW
Registered Capacity

πŸ“‹ Project Overview

Cambridge Solar Farm is a 49.9 MW solar farm project in Eastern. The applicant or operator on record is Big 60 Million. The planning application was refused. The determining authority is South Cambridgeshire, reference S/1714/15/FL.

Site Schematic

SUBSTATION ? ha Β· 49.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)49.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBig 60 Million
Owner / operatorBig 60 Million
LocationLand east of Battle Gate Road, St. Neots Road, Dry Drayton, Cambridge, Cambridgeshire, CB23 8BA
RegionEastern
Coordinates52.2380774Β°N, 0.0179205Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround

πŸ“… Project Timeline

2015-07-03