Land east of Battle Gate Road, St. Neots Road, Dry Drayton, Cambridge, Cambridgeshire, CB23 8BA
Cambridge Solar Farm is a 49.9 MW solar farm project in Eastern. The applicant or operator on record is Big 60 Million. The planning application was refused. The determining authority is South Cambridgeshire, reference S/1714/15/FL.β¦
Refused
Project stageRefused
PlanningJul 2015 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2019-06-10.
Registered planning capacity; not measured generation.
Cambridge Solar Farm is a 49.9 MW solar farm project in Eastern. The applicant or operator on record is Big 60 Million. The planning application was refused. The determining authority is South Cambridgeshire, reference S/1714/15/FL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.900 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Big 60 Million
Owner / operator
Big 60 Million
Location
Land east of Battle Gate Road, St. Neots Road, Dry Drayton, Cambridge, Cambridgeshire, CB23 8BA