π Project Overview
Callow Rock Quarry, Shipham Road - Solar Panels is a 0.2 MW solar farm project in South West. The applicant or operator on record is Regenerco Limited. Planning permission has been granted as of November 2024 and it is awaiting construction. The determining authority is Somerset, reference 17/24/00055.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Regenerco Limited |
| Owner / operator | Regenerco Limited |
| Year consented | 2024 |
| Location | Callow Rock Quarry, Shipham Road, Cheddar, Somerset, BS27 3DQ |
| Region | South West |
| Coordinates | 51.3004462Β°N, 2.7939605Β°W |