Cairncake is a 4.6 MW onshore wind project in Scotland. The applicant or operator on record is Alan Twatt (Potatoes) Ltd. The planning application was refused. The determining authority is Aberdeenshire, reference APP/2010/0755.…

Refused
Project stageRefused
  1. PlanningMar 2010 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2011-06-23.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

4.600 MW
Registered Capacity

πŸ“‹ Project Overview

Cairncake is a 4.6 MW onshore wind project in Scotland. The applicant or operator on record is Alan Twatt (Potatoes) Ltd. The planning application was refused. The determining authority is Aberdeenshire, reference APP/2010/0755.

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)4.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAlan Twatt (Potatoes) Ltd
Owner / operatorAlan Twatt (Potatoes) Ltd
LocationCuminestown, Turriff, Aberdeenshire. AB53 5YR, Grampian
RegionScotland
Coordinates57.2869332Β°N, 2.3757062Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2.3
No. of Turbines2

πŸ“… Project Timeline

2010-03-15