Butternut Box Symmetry Park Symmetry Way Blyth, Nottinghamshire, S81 8HH
Butternut Box, Symmetry Park - Solar Panels is a 0.7 MW solar farm project in East Midlands. The applicant or operator on record is Butternut Box. The scheme is currently in the planning system, submitted December 2025. The determining authority is Bassetlaw, reference 25/01437/Pβ¦
In Planning
Project stageIn planning
PlanningDec 2025 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2026-05-14.
Registered planning capacity; not measured generation.
Butternut Box, Symmetry Park - Solar Panels is a 0.7 MW solar farm project in East Midlands. The applicant or operator on record is Butternut Box. The scheme is currently in the planning system, submitted December 2025. The determining authority is Bassetlaw, reference 25/01437/PAN.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.700 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Butternut Box
Owner / operator
Butternut Box
Location
Butternut Box Symmetry Park Symmetry Way Blyth, Nottinghamshire, S81 8HH