Solar Farm

Butteriss Solar Park

Land Adjoining Butteriss Farm, Edgcumbe, Penryn, Cornwall, Cornwall, TR10 9EF

Butteriss Solar Park is a 3 MW solar farm project in South West. The applicant or operator on record is Antigua Solar. The planning application was refused. The determining authority is Cornwall, reference PA13/11664.…

Refused
Project stageRefused
  1. PlanningJan 2014 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2016-02-05.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

3.000 MW
Registered Capacity

πŸ“‹ Project Overview

Butteriss Solar Park is a 3 MW solar farm project in South West. The applicant or operator on record is Antigua Solar. The planning application was refused. The determining authority is Cornwall, reference PA13/11664.

Site Schematic

SUBSTATION ? ha Β· 3 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)3.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAntigua Solar
Owner / operatorAntigua Solar
LocationLand Adjoining Butteriss Farm, Edgcumbe, Penryn, Cornwall, Cornwall, TR10 9EF
RegionSouth West
Coordinates50.1506372Β°N, 5.1984227Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround

πŸ“… Project Timeline

2014-01-23