Solar Farm

Butt Lane, Hooton Pagnell - Solar Farm

Butt Lane, Hooton Pagnell, Doncaster, South Yorkshire, DN5 7BW

Butt Lane, Hooton Pagnell - Solar Farm is a 49.9 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is British Solar Renewables. The scheme is currently in the planning system, submitted December 2025. The determining authority is Doncaster, refer…

In Planning
Project stageIn planning
  1. PlanningDec 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2026-01-09.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.900 MW
Registered Capacity

πŸ“‹ Project Overview

Butt Lane, Hooton Pagnell - Solar Farm is a 49.9 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is British Solar Renewables. The scheme is currently in the planning system, submitted December 2025. The determining authority is Doncaster, reference 25/02389/FULM.

Site Schematic

SUBSTATION ? ha Β· 49.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)49.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBritish Solar Renewables
Owner / operatorBritish Solar Renewables
LocationButt Lane, Hooton Pagnell, Doncaster, South Yorkshire, DN5 7BW
RegionYorkshire and Humber
Coordinates53.5669705Β°N, 1.2676129Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID19249
Mounting Type for SolarGround
Solar Site Area (sqm)940000

πŸ“… Project Timeline

2025-12-05