Anchor Lane Farm, Newnham Drove, Burwell, Cambridge, Cambridgeshire, CB25 0BN
Burwell Anchor Lane Farm, Newnham Drove - Solar Panels is a 49.95 MW solar farm project in Eastern. The applicant or operator on record is Burwell AL Limited. Planning permission has been granted as of March 2026 and it is awaiting construction. The determining authority is East β¦
Consented / Approved
Project stageConsented
PlanningApr 2025 (completed)
ConsentedMar 2026 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2026-05-12.
Registered planning capacity; not measured generation.
Burwell Anchor Lane Farm, Newnham Drove - Solar Panels is a 49.95 MW solar farm project in Eastern. The applicant or operator on record is Burwell AL Limited. Planning permission has been granted as of March 2026 and it is awaiting construction. The determining authority is East Cambridgeshire, reference 25/00393/FUM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.950 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Burwell AL Limited
Owner / operator
Burwell AL Limited
Year consented
2026
Location
Anchor Lane Farm, Newnham Drove, Burwell, Cambridge, Cambridgeshire, CB25 0BN