Burnside Wind Cluster

Land to the West of Blackhills Farm, Cushnie, Alford, Grampian, AB33 8LQ

Burnside Wind Cluster is a 4.6 MW onshore wind project in Scotland. The applicant or operator on record is Renewable Energy Ventures. The planning application was refused. The determining authority is Aberdeenshire, reference APP/2013/2279.…

Refused
Project stageRefused
  1. PlanningJul 2013 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2014-06-06.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

4.600 MW
Registered Capacity

πŸ“‹ Project Overview

Burnside Wind Cluster is a 4.6 MW onshore wind project in Scotland. The applicant or operator on record is Renewable Energy Ventures. The planning application was refused. The determining authority is Aberdeenshire, reference APP/2013/2279.

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)4.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRenewable Energy Ventures
Owner / operatorRenewable Energy Ventures
LocationLand to the West of Blackhills Farm, Cushnie, Alford, Grampian, AB33 8LQ
RegionScotland
Coordinates57.1613697Β°N, 2.8147876Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2.3
No. of Turbines2
Are they re-applying (Old REPD Ref) 2877

πŸ“… Project Timeline

2013-07-24