Bioenergy / Waste

Burnside Farm Biomass Plant

Glen Cloy, Brodick, Isle of Arran, North Ayrshire, Strathclyde

Burnside Farm Biomass Plant is a 2.5 MW bioenergy / waste project in Scotland. The applicant or operator on record is Border Biofuels. The application has been withdrawn or the scheme abandoned. The determining authority is North Ayrshire.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJun 2001 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedOct 2001 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2006-06-16.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.500 MW
Registered Capacity

πŸ“‹ Project Overview

Burnside Farm Biomass Plant is a 2.5 MW bioenergy / waste project in Scotland. The applicant or operator on record is Border Biofuels. The application has been withdrawn or the scheme abandoned. The determining authority is North Ayrshire.

πŸ”§ Technical Specifications

Capacity (MW)2.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBorder Biofuels
Owner / operatorBorder Biofuels
Year consented2001
LocationGlen Cloy, Brodick, Isle of Arran, North Ayrshire, Strathclyde
RegionScotland
Coordinates55.5722858Β°N, 5.1627845Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2001-06-26
2001-10-08