Onshore Wind

Bullington Cross Wind Farm (Basingstoke and Deane)

Land At Bullington Cross, Upper Norton Farm, Sutton Scotney, Hants, Hampshire, SO21 3QF

Bullington Cross Wind Farm (Basingstoke and Deane) is a 8 MW onshore wind project in South East. The applicant or operator on record is EDF. The application has been withdrawn or the scheme abandoned. The determining authority is Winchester, reference 13/00046/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningApr 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Withdrawn.

Official register: July 2026

Recorded status: Appeal Withdrawn. Source record updated 2015-07-17.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

8.000 MW
Registered Capacity

πŸ“‹ Project Overview

Bullington Cross Wind Farm (Basingstoke and Deane) is a 8 MW onshore wind project in South East. The applicant or operator on record is EDF. The application has been withdrawn or the scheme abandoned. The determining authority is Winchester, reference 13/00046/FUL.

Site Schematic

SOUTH EAST Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)8.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperEDF
Owner / operatorEDF
LocationLand At Bullington Cross, Upper Norton Farm, Sutton Scotney, Hants, Hampshire, SO21 3QF
RegionSouth East
Coordinates51.1887007Β°N, 1.3117605Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2
No. of Turbines4

πŸ“… Project Timeline

2013-04-08