Land At Bullington Cross, Upper Norton Farm, Sutton Scotney, Hants, Hampshire, SO21 3QF
Bullington Cross Wind Farm (Basingstoke and Deane) is a 8 MW onshore wind project in South East. The applicant or operator on record is EDF. The application has been withdrawn or the scheme abandoned. The determining authority is Winchester, reference 13/00046/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningApr 2013 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Withdrawn.
Official register: July 2026
Recorded status: Appeal Withdrawn. Source record updated 2015-07-17.
Registered planning capacity; not measured generation.
Bullington Cross Wind Farm (Basingstoke and Deane) is a 8 MW onshore wind project in South East. The applicant or operator on record is EDF. The application has been withdrawn or the scheme abandoned. The determining authority is Winchester, reference 13/00046/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
8.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
EDF
Owner / operator
EDF
Location
Land At Bullington Cross, Upper Norton Farm, Sutton Scotney, Hants, Hampshire, SO21 3QF