Solar Farm

Brunswood Farm, Locko Road - Solar Panels

Brunswood Farm Locko Road Dale Abbey, Derbyshire, DE21 7BU

Brunswood Farm, Locko Road - Solar Panels is a 0.2 MW solar farm project in East Midlands. The applicant or operator on record is Private Developer. Planning permission has been granted as of January 2024 and it is awaiting construction. The determining authority is Erewash, refe…

Consented / Approved
Project stageConsented
  1. PlanningApr 2023 (completed)
  2. ConsentedJan 2024 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2024-02-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.200 MW
Registered Capacity

πŸ“‹ Project Overview

Brunswood Farm, Locko Road - Solar Panels is a 0.2 MW solar farm project in East Midlands. The applicant or operator on record is Private Developer. Planning permission has been granted as of January 2024 and it is awaiting construction. The determining authority is Erewash, reference 0423/0015.

Site Schematic

SUBSTATION ? ha Β· 0.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPrivate Developer
Owner / operatorPrivate Developer
Year consented2024
LocationBrunswood Farm Locko Road Dale Abbey, Derbyshire, DE21 7BU
RegionEast Midlands
Coordinates52.9414952Β°N, 1.4019022Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID
CfD Capacity (MW)
Turbine Capacity (MW)
No. of Turbines
Height of Turbines (m)
Mounting Type for SolarGround
Are they re-applying (Old REPD Ref)
Solar Site Area (sqm)898

πŸ“… Project Timeline

2023-04-06
2024-01-11