Bioenergy / Waste

Brooks Bros Timber Yard Energy Plant

Brooks Bros Timber Yard, Twitty Fee, Danbury, Chelmsford, Essex, CM3 4PG

Brooks Bros Timber Yard Energy Plant is a 0.6 MW bioenergy / waste project in Eastern. The applicant or operator on record is Brooks Bros (UK) Limited. The planning application was refused. The determining authority is Chelmsford, reference 24/01623/CLOPUD.…

Refused
Project stageRefused
  1. PlanningJan 2025 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2025-05-06.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.600 MW
Registered Capacity

πŸ“‹ Project Overview

Brooks Bros Timber Yard Energy Plant is a 0.6 MW bioenergy / waste project in Eastern. The applicant or operator on record is Brooks Bros (UK) Limited. The planning application was refused. The determining authority is Chelmsford, reference 24/01623/CLOPUD.

πŸ”§ Technical Specifications

Capacity (MW)0.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBrooks Bros (UK) Limited
Owner / operatorBrooks Bros (UK) Limited
LocationBrooks Bros Timber Yard, Twitty Fee, Danbury, Chelmsford, Essex, CM3 4PG
RegionEastern
Coordinates51.7235893Β°N, 0.5951003Β°E

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2025-01-28