Bioenergy / Waste

Bronzeoak Thermal

Btpl, Acorn Industrial Park, Dimmer Lane, Castle Cary,, Somerset, BA7 7NR

Bronzeoak Thermal is a 12.7 MW bioenergy / waste project in South West. The applicant or operator on record is Bronzeoak Thermal Processing. The application has been withdrawn or the scheme abandoned. The determining authority is Somerset, reference 02/01774/CPO.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJun 2002 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedAug 2002 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2011-08-17.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

12.700 MW
Registered Capacity

πŸ“‹ Project Overview

Bronzeoak Thermal is a 12.7 MW bioenergy / waste project in South West. The applicant or operator on record is Bronzeoak Thermal Processing. The application has been withdrawn or the scheme abandoned. The determining authority is Somerset, reference 02/01774/CPO.

πŸ”§ Technical Specifications

Capacity (MW)12.700 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBronzeoak Thermal Processing
Owner / operatorBronzeoak Thermal Processing
Year consented2002
LocationBtpl, Acorn Industrial Park, Dimmer Lane, Castle Cary,, Somerset, BA7 7NR
RegionSouth West
Coordinates51.0851826Β°N, 2.5464291Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2002-06-07
2002-08-22