Broad Path Landfill Site, Road From Down Farm Cross To Hillhead Quarry, Uffculme, Cullompton, Devon, EX15 3EP
Broad Path - Solar Panels is a 4.3 MW solar farm project in South West. The applicant or operator on record is Valencia Energy Limited. The scheme is currently in the planning system, submitted January 2025. The determining authority is Mid Devon, reference DCC/4419/2024.β¦
In Planning
Project stageIn planning
PlanningJan 2025 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2025-02-17.
Registered planning capacity; not measured generation.
Broad Path - Solar Panels is a 4.3 MW solar farm project in South West. The applicant or operator on record is Valencia Energy Limited. The scheme is currently in the planning system, submitted January 2025. The determining authority is Mid Devon, reference DCC/4419/2024.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
4.300 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Valencia Energy Limited
Owner / operator
Valencia Energy Limited
Location
Broad Path Landfill Site, Road From Down Farm Cross To Hillhead Quarry, Uffculme, Cullompton, Devon, EX15 3EP