British Aerospace Airbus Limited, Chester Road, Broughton, Chester, Clwyd, CH4 0DR
British Aerospace Airbus, Chester Road - Solar Panels is a 1.3 MW solar farm project in Wales. The applicant or operator on record is British Aerospace Airbus Limited. Planning permission has been granted as of September 2025 and it is awaiting construction. The determining authoβ¦
Consented / Approved
Project stageConsented
PlanningJun 2025 (completed)
ConsentedSep 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-12-09.
Registered planning capacity; not measured generation.
British Aerospace Airbus, Chester Road - Solar Panels is a 1.3 MW solar farm project in Wales. The applicant or operator on record is British Aerospace Airbus Limited. Planning permission has been granted as of September 2025 and it is awaiting construction. The determining authority is Flintshire, reference FUL/000177/25.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.300 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
British Aerospace Airbus Limited
Owner / operator
British Aerospace Airbus Limited
Year consented
2025
Location
British Aerospace Airbus Limited, Chester Road, Broughton, Chester, Clwyd, CH4 0DR