Brioche Pasquier Uk Garamonde Drive Wymbush, Buckinghamshire, MK8 8DF
Brioche Pasquier, Garamonde Drive - Solar Panels is a 0.94 MW solar farm project in South East. The applicant or operator on record is Brioche Pasquier. The planning application was refused. The determining authority is Milton Keynes, reference 24/00684/PRIOR.β¦
Refused
Project stageRefused
PlanningMar 2024 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2024-05-21.
Registered planning capacity; not measured generation.
Brioche Pasquier, Garamonde Drive - Solar Panels is a 0.94 MW solar farm project in South East. The applicant or operator on record is Brioche Pasquier. The planning application was refused. The determining authority is Milton Keynes, reference 24/00684/PRIOR.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.940 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Brioche Pasquier
Owner / operator
Brioche Pasquier
Location
Brioche Pasquier Uk Garamonde Drive Wymbush, Buckinghamshire, MK8 8DF