Bioenergy / Waste

Brigg Renewable Energy Plant

British Sugar Corporation Ltd, Access roads to power station, Scawby, Humberside, DN20 9LT

Brigg Renewable Energy Plant is a 40 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Private Developer. The scheme is currently in the planning system, submitted May 2008. The determining authority is North Lincolnshire, reference PA/2…

Revised
Project stageSuperseded by a new application
  1. PlanningMay 2008 (completed)
  2. Superseded by a new application (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2011-08-18.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

40.000 MW
Registered Capacity

πŸ“‹ Project Overview

Brigg Renewable Energy Plant is a 40 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Private Developer. The scheme is currently in the planning system, submitted May 2008. The determining authority is North Lincolnshire, reference PA/2008/0793.

πŸ”§ Technical Specifications

Capacity (MW)40.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPrivate Developer
Owner / operatorPrivate Developer
LocationBritish Sugar Corporation Ltd, Access roads to power station, Scawby, Humberside, DN20 9LT
RegionYorkshire and Humber
Coordinates53.542328Β°N, 0.5096091Β°W

Additional published register fields

Registered technologyBiomass (dedicated)
Are they re-applying (New REPD Ref)150

πŸ“… Project Timeline

2008-05-22