Solar Farm

Bridge Farm, Earith Fen Drove - Solar Panels

Bridge Farm, Earith Fen Drove, Colne, Huntingdon, Cambridgeshire, PE28 3RE

Bridge Farm, Earith Fen Drove - Solar Panels is a 0.2 MW solar farm project in Eastern. The applicant or operator on record is Private Developer. The application has been withdrawn or the scheme abandoned. The determining authority is Huntingdonshire, reference 25/01284/CLPD.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJul 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2025-11-07.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.200 MW
Registered Capacity

πŸ“‹ Project Overview

Bridge Farm, Earith Fen Drove - Solar Panels is a 0.2 MW solar farm project in Eastern. The applicant or operator on record is Private Developer. The application has been withdrawn or the scheme abandoned. The determining authority is Huntingdonshire, reference 25/01284/CLPD.

Site Schematic

SUBSTATION ? ha Β· 0.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPrivate Developer
Owner / operatorPrivate Developer
LocationBridge Farm, Earith Fen Drove, Colne, Huntingdon, Cambridgeshire, PE28 3RE
RegionEastern
Coordinates52.3663028Β°N, 0.0262839Β°E

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2025-07-14