Bridge Farm, Earith Fen Drove - Solar Panels is a 0.2 MW solar farm project in Eastern. The applicant or operator on record is Private Developer. The application has been withdrawn or the scheme abandoned. The determining authority is Huntingdonshire, reference 25/01284/CLPD.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJul 2025 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2025-11-07.
Registered planning capacity; not measured generation.
Bridge Farm, Earith Fen Drove - Solar Panels is a 0.2 MW solar farm project in Eastern. The applicant or operator on record is Private Developer. The application has been withdrawn or the scheme abandoned. The determining authority is Huntingdonshire, reference 25/01284/CLPD.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.