Solar Farm

Bridec Melamine Boards, West Bay Road - Solar Panels

Bridec Melamine Boards Ltd West Bay Road, Dorset, DT6 4EH

Bridec Melamine Boards, West Bay Road - Solar Panels is a 0.2 MW solar farm project in South West. The applicant or operator on record is Bridec Melamine Boards Limited. Planning permission has been granted as of August 2023 and it is awaiting construction. The determining author…

Consented / Approved
Project stageConsented
  1. PlanningJun 2023 (completed)
  2. ConsentedAug 2023 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2023-08-15.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.200 MW
Registered Capacity

πŸ“‹ Project Overview

Bridec Melamine Boards, West Bay Road - Solar Panels is a 0.2 MW solar farm project in South West. The applicant or operator on record is Bridec Melamine Boards Limited. Planning permission has been granted as of August 2023 and it is awaiting construction. The determining authority is Dorset, reference P/FUL/2023/03426.

Site Schematic

SUBSTATION ? ha Β· 0.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBridec Melamine Boards Limited
Owner / operatorBridec Melamine Boards Limited
Year consented2023
LocationBridec Melamine Boards Ltd West Bay Road, Dorset, DT6 4EH
RegionSouth West
Coordinates50.7135255Β°N, 2.7581649Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2023-06-16
2023-08-10