The North Of Brick Yard Road Gamston, Nottinghamshire, NG20 0YD
Brecks Solar Farm is a 45.4 MW solar farm project in East Midlands. The applicant or operator on record is Green Switch Capital Limited. Planning permission has been granted as of September 2023 and it is awaiting construction. The determining authority is Mansfield, reference 23β¦
Consented / Approved
Project stageConsented
PlanningMay 2023 (completed)
ConsentedSep 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2026-02-16.
Registered planning capacity; not measured generation.
Brecks Solar Farm is a 45.4 MW solar farm project in East Midlands. The applicant or operator on record is Green Switch Capital Limited. Planning permission has been granted as of September 2023 and it is awaiting construction. The determining authority is Mansfield, reference 23/00656/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
45.400 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Green Switch Capital Limited
Owner / operator
Green Switch Capital Limited
Year consented
2023
Location
The North Of Brick Yard Road Gamston, Nottinghamshire, NG20 0YD