Onshore Wind

Braint Wind Farm

On Land At Bryn Eryr Uchaf, Porthaethwy, Menai Bridge, Gwynedd, Gwynedd, LL59 5SA

Braint Wind Farm is a 2.6 MW onshore wind project in Wales. The applicant or operator on record is West Coast Energy. The planning application was refused. The determining authority is Isle of Anglesey, reference 41C125B/EIA/RE.…

Refused
Project stageRefused
  1. PlanningAug 2013 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2016-09-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.600 MW
Registered Capacity

πŸ“‹ Project Overview

Braint Wind Farm is a 2.6 MW onshore wind project in Wales. The applicant or operator on record is West Coast Energy. The planning application was refused. The determining authority is Isle of Anglesey, reference 41C125B/EIA/RE.

Site Schematic

WALES Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWest Coast Energy
Owner / operatorWest Coast Energy
LocationOn Land At Bryn Eryr Uchaf, Porthaethwy, Menai Bridge, Gwynedd, Gwynedd, LL59 5SA
RegionWales
Coordinates53.2546928Β°N, 4.2039684Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)0.85
No. of Turbines3

πŸ“… Project Timeline

2013-08-14