Solar Site South Of Brains Farm Moor Lane Wincanton, Somerset, BA9
Brains Solar Farm is a 18.8 MW solar farm project in South West. The applicant or operator on record is NextPower SPV 13 Limited. Planning permission has been granted as of January 2022 and it is awaiting construction. The determining authority is Somerset, reference 21/02205/FULβ¦
Consented / Approved
Project stageConsented
PlanningJul 2021 (completed)
ConsentedJan 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2022-01-19.
Registered planning capacity; not measured generation.
Brains Solar Farm is a 18.8 MW solar farm project in South West. The applicant or operator on record is NextPower SPV 13 Limited. Planning permission has been granted as of January 2022 and it is awaiting construction. The determining authority is Somerset, reference 21/02205/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
18.800 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
NextPower SPV 13 Limited
Owner / operator
NextPower SPV 13 Limited
Year consented
2022
Location
Solar Site South Of Brains Farm Moor Lane Wincanton, Somerset, BA9