πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Brailsford Farm

Brailsford Farm, North Lane, Brailsford, Ashbourne, Derbyshire, DE6 3BE

Brailsford Farm is a 1.2 MW solar farm project in East Midlands. The applicant or operator on record is Mulbrick Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Derbyshire Dales, reference 15/00526/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningSep 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedDec 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2018-10-23.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.200 MW
Registered Capacity

πŸ“‹ Project Overview

Brailsford Farm is a 1.2 MW solar farm project in East Midlands. The applicant or operator on record is Mulbrick Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Derbyshire Dales, reference 15/00526/FUL.

Site Schematic

SUBSTATION ? ha Β· 1.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperMulbrick Clean Energy
Owner / operatorMulbrick Clean Energy
Year consented2015
LocationBrailsford Farm, North Lane, Brailsford, Ashbourne, Derbyshire, DE6 3BE
RegionEast Midlands
Coordinates52.9928158Β°N, 1.6097816Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)28000

πŸ“… Project Timeline

2015-09-04
2015-12-02