πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Bradford Energy Recovery Facility

Former Solaglas Site, Ripley Road, Bradford, West Yorkshire, BD4 7TP, West Yorkshire

Bradford Energy Recovery Facility is a 12.9 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Energos (formerly Biogen Power). The application has been withdrawn or the scheme abandoned. The determining authority is Bradford, reference 1…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningApr 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJun 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2020-06-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

12.900 MW
Registered Capacity

πŸ“‹ Project Overview

Bradford Energy Recovery Facility is a 12.9 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Energos (formerly Biogen Power). The application has been withdrawn or the scheme abandoned. The determining authority is Bradford, reference 13/01257/FUL.

πŸ”§ Technical Specifications

Capacity (MW)12.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperEnergos (formerly Biogen Power)
Owner / operatorEnergos (formerly Biogen Power)
Year consented2013
LocationFormer Solaglas Site, Ripley Road, Bradford, West Yorkshire, BD4 7TP, West Yorkshire
RegionYorkshire and Humber
Coordinates53.7821945Β°N, 1.7500734Β°W

Additional published register fields

Registered technologyEfW Incineration

πŸ“… Project Timeline

2013-04-01
2013-06-26