πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Bracks Farm

Bracks Farm, Wicken, Ely,, Cambridgeshire, CB7

Bracks Farm is a 28 MW solar farm project in Eastern. The applicant or operator on record is British Solar Renewables / BayWa r.e. UK Limited. It is recorded as operational since October 2023. The determining authority is East Cambridgeshire, reference 20/00522/FUM.…

Operational Β· Since 2023
28 MW
Installed Capacity
2023
Commissioned

πŸ“‹ Project Overview

Bracks Farm is a 28 MW solar farm project in Eastern. The applicant or operator on record is British Solar Renewables / BayWa r.e. UK Limited. It is recorded as operational since October 2023. The determining authority is East Cambridgeshire, reference 20/00522/FUM.

Site Schematic

SUBSTATION ? ha Β· 28 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)28 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBritish Solar Renewables / BayWa r.e. UK Limited
Owner / operatorBritish Solar Renewables / BayWa r.e. UK Limited
Year consented2021
Commissioned / target2023
LocationBracks Farm, Wicken, Ely,, Cambridgeshire, CB7
RegionEastern
Coordinates52.3189991Β°N, 0.318996Β°E

πŸ“… Project Timeline