In the centre of the '3M roundabout', which is at the junction of A329 (Millennium Way), B3018 (Binfield Road), Bond Way and B3048 (Wokingham Road)., Berkshire

Bracknell Forest Biomass Centre is a 1.1 MW bioenergy / waste project in South East. The applicant or operator on record is Under tender. The application has been withdrawn or the scheme abandoned. The determining authority is Bracknell Forest, reference 04/01129/OUT.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningNov 2004 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedDec 2006 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2019-12-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.100 MW
Registered Capacity

πŸ“‹ Project Overview

Bracknell Forest Biomass Centre is a 1.1 MW bioenergy / waste project in South East. The applicant or operator on record is Under tender. The application has been withdrawn or the scheme abandoned. The determining authority is Bracknell Forest, reference 04/01129/OUT.

πŸ”§ Technical Specifications

Capacity (MW)1.100 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperUnder tender
Owner / operatorUnder tender
Year consented2006
LocationIn the centre of the '3M roundabout', which is at the junction of A329 (Millennium Way), B3018 (Binfield Road), Bond Way and B3048 (Wokingham Road)., Berkshire
RegionSouth East
Coordinates51.4183059Β°N, 0.7551137Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2004-11-25
2006-12-21