Site located by the M8 between Glasgow and Edinburgh, Strathclyde
Bracco / Black Hill is a 72.5 MW onshore wind project in Scotland. The applicant or operator on record is Airtricity. The application has been withdrawn or the scheme abandoned. The determining authority is Scottish Government (S36).β¦
Withdrawn
Project stageWithdrawn / abandoned
Planning (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2008-04-24.
Registered planning capacity; not measured generation.
Bracco / Black Hill is a 72.5 MW onshore wind project in Scotland. The applicant or operator on record is Airtricity. The application has been withdrawn or the scheme abandoned. The determining authority is Scottish Government (S36).
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
72.500 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Airtricity
Owner / operator
Airtricity
Location
Site located by the M8 between Glasgow and Edinburgh, Strathclyde