Bioenergy / Waste

Boyndie Airfield Biomass

Boyndie, Banff, Grampian, Grampian, AB45 2LR

Boyndie Airfield Biomass is a 4 MW bioenergy / waste project in Scotland. The applicant or operator on record is Boyndie Biomass. The application has been withdrawn or the scheme abandoned. The determining authority is Aberdeenshire, reference APP/2009/2327.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJul 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedFeb 2010 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2013-02-06.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

4.000 MW
Registered Capacity

πŸ“‹ Project Overview

Boyndie Airfield Biomass is a 4 MW bioenergy / waste project in Scotland. The applicant or operator on record is Boyndie Biomass. The application has been withdrawn or the scheme abandoned. The determining authority is Aberdeenshire, reference APP/2009/2327.

πŸ”§ Technical Specifications

Capacity (MW)4.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBoyndie Biomass
Owner / operatorBoyndie Biomass
Year consented2010
LocationBoyndie, Banff, Grampian, Grampian, AB45 2LR
RegionScotland
Coordinates57.6653298Β°N, 2.638964Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2009-07-16
2010-02-24