Land at Bottom Plain, Bere Road, Trigon, Wareham, Dorset
Bottom Plain is a 10 MW solar farm project in South West. The applicant or operator on record is Inazin Energy/Low Carbon. It is recorded as operational since December 2014. The determining authority is Dorset, reference 6/2013/0443.β¦
OperationalΒ· Since 2014
Project stageOperating
PlanningAug 2013 (completed)
ConsentedNov 2013 (completed)
ConstructionOct 2014 (completed)
OperatingDec 2014 (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2015-04-01.
Registered planning capacity; not measured generation.
Bottom Plain is a 10 MW solar farm project in South West. The applicant or operator on record is Inazin Energy/Low Carbon. It is recorded as operational since December 2014. The determining authority is Dorset, reference 6/2013/0443.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
10.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Inazin Energy/Low Carbon
Owner / operator
Inazin Energy/Low Carbon
Year consented
2013
Construction started
2014
Commissioned / target
2014
Location
Land at Bottom Plain, Bere Road, Trigon, Wareham, Dorset