Border Control Post Coble Dene, Tyne And Wear, NE29 6EE
Border Control Post, Coble Dene - Solar Panels is a 0.25 MW solar farm project in North East. The applicant or operator on record is Advanced Renewable Power Limited. Planning permission has been granted as of September 2025 and it is awaiting construction. The determining authorβ¦
Consented / Approved
Project stageConsented
PlanningJul 2025 (completed)
ConsentedSep 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-09-30.
Registered planning capacity; not measured generation.
Border Control Post, Coble Dene - Solar Panels is a 0.25 MW solar farm project in North East. The applicant or operator on record is Advanced Renewable Power Limited. Planning permission has been granted as of September 2025 and it is awaiting construction. The determining authority is North Tyneside, reference 25/00977/PRIOTH.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.250 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Advanced Renewable Power Limited
Owner / operator
Advanced Renewable Power Limited
Year consented
2025
Location
Border Control Post Coble Dene, Tyne And Wear, NE29 6EE