πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Blaise Farm (Farm AD)

Blaise Farm Quarry Kings Hill West Malling, Kent, ME19 4PN

Blaise Farm (Farm AD) is a 5 MW bioenergy / waste project in South East. The applicant or operator on record is PandaGreen. The application has been withdrawn or the scheme abandoned. The determining authority is Tonbridge and Malling, reference 12/02549/WAS.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningAug 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedApr 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2016-10-31.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Blaise Farm (Farm AD) is a 5 MW bioenergy / waste project in South East. The applicant or operator on record is PandaGreen. The application has been withdrawn or the scheme abandoned. The determining authority is Tonbridge and Malling, reference 12/02549/WAS.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPandaGreen
Owner / operatorPandaGreen
Year consented2013
LocationBlaise Farm Quarry Kings Hill West Malling, Kent, ME19 4PN
RegionSouth East
Coordinates51.2812632Β°N, 0.3817927Β°E

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2012-08-13
2013-04-16