Onshore Wind

Blaen Bowi Wind Farm (Extension)

BLAEN BOWI WIND FARM LAN FARM CAPEL IWAN NEWCASTLE EMLYN, Dyfed, SA38 9NN

Blaen Bowi Wind Farm (Extension) is a 9.1 MW onshore wind project in Wales. The applicant or operator on record is Windjen Power Ltd / Dulas Ltd. The planning application was refused. The determining authority is Carmarthenshire, reference W/09828.…

Refused
Project stageRefused
  1. PlanningApr 2005 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2011-09-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

9.100 MW
Registered Capacity

πŸ“‹ Project Overview

Blaen Bowi Wind Farm (Extension) is a 9.1 MW onshore wind project in Wales. The applicant or operator on record is Windjen Power Ltd / Dulas Ltd. The planning application was refused. The determining authority is Carmarthenshire, reference W/09828.

Site Schematic

WALES Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)9.100 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWindjen Power Ltd / Dulas Ltd
Owner / operatorWindjen Power Ltd / Dulas Ltd
LocationBLAEN BOWI WIND FARM LAN FARM CAPEL IWAN NEWCASTLE EMLYN, Dyfed, SA38 9NN
RegionWales
Coordinates51.9971115Β°N, 4.4412529Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)3
No. of Turbines3

πŸ“… Project Timeline

2005-04-26