πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Other Registered Technology

Blackbridge TGS 1

Blackbridge Farm, Cranford Road, Kettering, NN15 5JJ, Northamptonshire, NN15 5JJ

Blackbridge TGS 1 is a 5.6 MW other registered technology project in East Midlands. The applicant or operator on record is Think Greenenergy TOPCO (Think Environmental). The application has been withdrawn or the scheme abandoned. The determining authority is North Northamptonshir…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningMar 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2018-12-14.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.600 MW
Registered Capacity

πŸ“‹ Project Overview

Blackbridge TGS 1 is a 5.6 MW other registered technology project in East Midlands. The applicant or operator on record is Think Greenenergy TOPCO (Think Environmental). The application has been withdrawn or the scheme abandoned. The determining authority is North Northamptonshire, reference 09/00014/WAS.

πŸ”§ Technical Specifications

Capacity (MW)5.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperThink Greenenergy TOPCO (Think Environmental)
Owner / operatorThink Greenenergy TOPCO (Think Environmental)
LocationBlackbridge Farm, Cranford Road, Kettering, NN15 5JJ, Northamptonshire, NN15 5JJ
RegionEast Midlands
Coordinates52.3778649Β°N, 0.6654465Β°W

Additional published register fields

Registered technologyAdvanced Conversion Technologies
CfD Allocation RoundAR2

πŸ“… Project Timeline

2009-03-06