The Long Causeway, Burnley Way, Burnley, Lancashire, Lancashire
Black Scout Wind Farm is a 2 MW onshore wind project in North West. The applicant or operator on record is Renewable Energy Systems (RES). The planning application was refused. The determining authority is Burnley.β¦
Refused
Project stageRefused
PlanningJan 2000 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2003-09-26.
Registered planning capacity; not measured generation.
Black Scout Wind Farm is a 2 MW onshore wind project in North West. The applicant or operator on record is Renewable Energy Systems (RES). The planning application was refused. The determining authority is Burnley.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
2.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Renewable Energy Systems (RES)
Owner / operator
Renewable Energy Systems (RES)
Location
The Long Causeway, Burnley Way, Burnley, Lancashire, Lancashire