πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Bishop's Castle Biomass Power Project

Shropshire

Bishop's Castle Biomass Power Project is a 13 MW bioenergy / waste project in West Midlands. The applicant or operator on record is Bishop's Castle Biomass Power Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Shropshire, reference 08…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningMar 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedSep 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2012-02-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

13.000 MW
Registered Capacity

πŸ“‹ Project Overview

Bishop's Castle Biomass Power Project is a 13 MW bioenergy / waste project in West Midlands. The applicant or operator on record is Bishop's Castle Biomass Power Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Shropshire, reference 08/20502/F.

πŸ”§ Technical Specifications

Capacity (MW)13.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBishop's Castle Biomass Power Ltd
Owner / operatorBishop's Castle Biomass Power Ltd
Year consented2009
LocationShropshire
RegionWest Midlands
Coordinates52.4877991Β°N, 2.9924899Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2008-03-07
2009-09-04