Solar Farm, Broad Lane, Bishampton, Pershore, Worcestershire, WR10 2NF
Bishampton Solar Farm is a 8.8 MW battery storage project in West Midlands. The applicant or operator on record is Infinis. The application has been withdrawn or the scheme abandoned. The determining authority is Wychavon, reference 20/02071/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningOct 2020 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2022-12-06.
Registered planning capacity; not measured generation.
Bishampton Solar Farm is a 8.8 MW battery storage project in West Midlands. The applicant or operator on record is Infinis. The application has been withdrawn or the scheme abandoned. The determining authority is Wychavon, reference 20/02071/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
8.800 MW
Battery chemistry
Co-located with RE
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Infinis
Owner / operator
Infinis
Location