π Project Overview
Billingbear Solar Farm - Hydrogen is a conventional hydro project in South East. The applicant or operator on record is WT Energy Limited. Planning permission has been granted as of July 2024 and it is awaiting construction. The determining authority is Windsor and Maidenhead, reference 22/02820/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | WT Energy Limited |
| Owner / operator | WT Energy Limited |
| Year consented | 2024 |
| Location | S/O Valentines, The Straight Mile, Shurlock Row, Reading, Berkshire, RG10 0QN |
| Region | South East |
| Coordinates | 51.4598396Β°N, 0.8087399Β°W |