Land At Bilbo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian, Aberdeenshire, AB43 8QJ
Bilbo Solar Farm Energy Storage is a 40 MW battery storage project in Scotland. The applicant or operator on record is Green Energy International. It is recorded as under construction since January 2024. The determining authority is Aberdeenshire, reference APP/2019/0296.β¦
Under Construction
Project stageUnder construction
PlanningJun 2019 (completed)
ConsentedOct 2019 (completed)
ConstructionJan 2024 (current stage)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Under Construction.
Official register: July 2026
Recorded status: Under Construction. Source record updated 2025-02-03.
Registered planning capacity; not measured generation.
Bilbo Solar Farm Energy Storage is a 40 MW battery storage project in Scotland. The applicant or operator on record is Green Energy International. It is recorded as under construction since January 2024. The determining authority is Aberdeenshire, reference APP/2019/0296.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
40.000 MW
Battery chemistry
Co-located with RE
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Green Energy International
Owner / operator
Green Energy International
Year consented
2019
Construction started
2024
Location
Land At Bilbo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian, Aberdeenshire, AB43 8QJ