πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

BGB Engineering Limited - Solar Panels Scheme

357 Dysart Road, Grantham, Lincolnshire, NG31 7NB

BGB Engineering Limited - Solar Panels Scheme is a 0.21 MW solar farm project in East Midlands. The applicant or operator on record is BGB Innovation. Planning permission has been granted as of July 2022 and it is awaiting construction. The determining authority is South Kesteven…

Consented / Approved
Project stageConsented
  1. PlanningMay 2022 (completed)
  2. ConsentedJul 2022 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2022-06-17.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.210 MW
Registered Capacity

πŸ“‹ Project Overview

BGB Engineering Limited - Solar Panels Scheme is a 0.21 MW solar farm project in East Midlands. The applicant or operator on record is BGB Innovation. Planning permission has been granted as of July 2022 and it is awaiting construction. The determining authority is South Kesteven, reference S22/0982.

Site Schematic

SUBSTATION ? ha Β· 0.21 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.210 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBGB Innovation
Owner / operatorBGB Innovation
Year consented2022
Location357 Dysart Road, Grantham, Lincolnshire, NG31 7NB
RegionEast Midlands
Coordinates52.90956Β°N, 0.673998Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2022-05-12
2022-07-20